Metro Manila Subway, designated MRT-9 and also known as the Mega Manila Subway, is a 33-kilometer underground rapid transit line under construction across Metro Manila in the Philippines, running from East Valenzuela in the north to Bicutan in the south with a spur line serving NAIA Terminal 3.[3] The line is owned and operated by the Department of Transportation (DOTr).[3] It carries 17 stations and is the first underground railway in the country.[1] It is funded largely through official development assistance from the Japan International Cooperation Agency (JICA).[2]

First principles: underground alignment

The Metro Manila Subway is planned as an underground railway.[3]

A rider travelling the full alignment end to end is expected to cover the distance from Valenzuela to Bicutan in 46 minutes, and the Valenzuela to NAIA trip is projected to fall from about 1 hour and 30 minutes to 40 minutes.[1][2]

Route and stations

The line is planned as 17 stations along 33 kilometers, from East Valenzuela in the north to Bicutan in the south.[1] The table below reproduces the station list and the approximate locations published by Rappler.[1]

StationLocationCity
East ValenzuelaBeside the northbound side of Mindanao Avenue near P. Dela Cruz StreetValenzuela City
Quirino HighwayCorner of Mindanao Avenue and Quirino HighwayQuezon City
Tandang SoraAlong Mindanao Avenue, near the intersection of Mindanao Avenue and Tandang Sora AvenueQuezon City
North AvenueWithin the property of Veterans Memorial Medical Center (DND property), on the corner of Mindanao Avenue and North AvenueQuezon City
Quezon AvenueCorner of EDSA and Quezon Avenue, at the Manila Seedlings (NHA property)Quezon City
East AvenueAlong V. Luna Street, near East Avenue and Kalayaan AvenueQuezon City
AnonasOn the property of LBL Prime, near the LRT-2 Anonas stationQuezon City
Camp AguinaldoWithin the property of Camp Aguinaldo, near the corner of Col. Boni Serrano and Katipunan AvenueQuezon City
OrtigasWithin Metrowalk, near Meralco Avenue and Unimart (PCGG, Blemp property)Pasig City
Shaw BoulevardAlong Meralco Avenue, in front of Estancia Mall (OCLP property)Pasig City
Kalayaan AvenueAlong the intersection of 11th Avenue and 38th Street of the BGC areaTaguig City
BGCAlong the rotunda, between the Market! Market! and Serendra buildingsTaguig City
Lawton AvenueWithin NAMRIA property and Megaworld property in McKinleyTaguig City
Senate-DepEdWithin the DepEd property near Chino Roces Road, and the NSCR Nichols stationTaguig City
NAIA Terminal 3Within the parking area of NAIA Terminal 3Pasay City
FTI/Arca SouthIntegrated with the NSCR FTI stationParañaque City
BicutanCommon station with the NSCR extensionParañaque City

NAIA Terminal 3 appears in the published station list between Senate-DepEd and FTI/Arca South, but it is served by a spur line rather than by the through route.[1]

The NAIA Terminal 3 spur

The main alignment runs from East Valenzuela to Bicutan. A separate spur line branches to NAIA Terminal 3, which connects the country's principal airport to a railway for the first time.[1] The Terminal 3 station is part of Contract Package 109, which also covers the construction of connecting tunnels between Taguig City and Pasay City.[2]

Ground was broken for the NAIA Terminal 3 station on September 16, 2026.[2]

Design and rolling stock

The alignment is 33 kilometers long, entirely underground, and double-track, with a depot at Ugong in Valenzuela.[3] Track gauge is 1,435 millimeters (standard gauge), electrification is at 1,500 volts DC through overhead lines, and the operating speed is 80 kilometers per hour.[3]

Rolling stock is the Sustina electric multiple unit series, and signalling is the Nippon Signal SPARCS moving-block communications-based train control (CBTC) system.[3] The project also uses underpinning technology from Japan, which allows construction to proceed beneath existing infrastructure while maintaining its structural integrity.[2]

Interchanges

Four verified interchanges appear in the published station data:

Route diagrams elsewhere show links from the North Avenue and Quezon Avenue stations to other rail lines. Those links are not confirmed by the sources cited on this page and are therefore not stated as interchanges here.

Cost and funding

The project is expected to cost 355.6 billion pesos, equivalent to about USD 7.06 billion at 2017 exchange rates.[3] Much of that cost is covered by loans from the Japan International Cooperation Agency, and the project is described by the DOTr as JICA-funded.[3][2]

Construction is procured in contract packages. Contract Package 109 covers the NAIA Terminal 3 station and the connecting tunnels between Taguig City and Pasay City.[2] Contract Package 108, which covers the subway section connecting the new Senate building to Lawton in Taguig City, was still under procurement as of September 2026.[2]

Construction status

On September 16, 2026, President Ferdinand Marcos Jr. said the project had reached nearly 60 percent overall progress, with construction activities underway across much of the alignment.[2] Wikipedia records the DOTr reporting an overall status of 60 percent and a physical construction progress of approximately 32 percent as of July 2026.[3]

The right of way process is reported as 90 percent complete, and the right of way for the entire station area was described as secured.[3][2] One of the most difficult acquisition problems involved properties inside Corinthian Gardens subdivision in Quezon City; the DOTr states that it was resolved following the enactment of Republic Act 12289, the Accelerated and Reformed Right-of-Way (ARROW) Act, with the private owners agreeing to a negotiated sale.[2]

DOTr Acting Secretary Giovanni Z. Lopez said in September 2026 that the project remains on track for completion by 2031, with operations expected to begin the following year.[2] Wikipedia lists the planned opening for Phase 1 as 2032.[3]

Projected ridership

The two cited sources give different ridership projections, and both are reported here rather than reconciled.

Timeline

DateEvent
February 27, 2019Groundbreaking for the project.[3]
April 2022Partial operations target moved from 2022 to 2025, with full operations set for 2027, after the COVID-19 pandemic hindered construction.[3]
July 10, 2023The DOTr drops the plan for partial operations by 2027 and opts to open the subway fully by 2029.[3]
September 16, 2026Groundbreaking for the NAIA Terminal 3 station; the project is reported at nearly 60 percent overall progress.[2]
2031Completion target stated by the DOTr.[2]
2032Operations target, after the timeline was moved from 2027 to 2029 and then to 2032 because of right of way issues.[2][3]

See also

References

  1. ↑ Lance Spencer Yu, “MAP: Metro Manila Subway stations,” Rappler. https://www.rappler.com/business/map-metro-manila-subway-stations/
  2. ↑ “Metro Manila Subway construction reaches nearly 60%,” Philippine Resources Journal, September 2026. https://www.philippine-resources.com/articles/2026/9/metro-manila-subway-construction-reaches-nearly-60
  3. ↑ “Metro Manila Subway,” Wikipedia. https://en.wikipedia.org/wiki/Metro_Manila_Subway